Power Grid: Québec/Baden-Württemberg (2012)

Spelafbeelding 419cd83f96b1391c0196b1b18df703b8_thb.jpg 🔎
Speeltijd: 120
Min. Leeftijd: 13
Spelers: 2 - 6
Uitgever: Rio Grande Games, 2F-Spiele
Ontwerpers: Friedemann Friese
Kunstenaars: Lars-Arne "Maura" Kalusky
Mechanismen: Network and Route Building, Auction / Bidding, Market, Income

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.

In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.

In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.

Only a single printing of Power Grid: Québec & Baden-Württemberg will be produced, although the Québec map will remain available in Mégawatts.

Incorporates maps from:

Mégawatts
Funkenschlag: EnBW




We hebben momenteel geen prijsgegevens voor dit spel.
Dit spel wordt momenteel niet verhandeld op de marktplaats:
Dit spel staat momenteel niet op de marktplaats. Als u het uwe wilt verkopen, voeg het dan toe aan de marktplaats. Marktplaats

Gerelateerde Spellen

ag.gameitem.lastUpdated: 2025-05-23 14:32:13.709